Functional adjustment interventions for the electrification of the Montebelluna-Feltre line

Adaptation of the site and outline as well as consolidation…

idro1

Securing tunnel SP 58 in the municipality of Idro (BS)

Works for the arrangement and safety of the tunnel located…

frasassi 3

Conservation interventions Frasassi Caves – Genga (AN)

Works for conservation interventions by cleaning from natural weeds and…

carrello

Fursil mines | Colle Santa Lucia (BL)

Eco-sustainable recovery of the ancient iron ore mine from medieval…

consolidamento translagunare

Consolidation and dredging of Ponte della Libertà arches | Venice

Consolidation works of the rail bridge across the lagoon on…

Galleria-della-pierina-5

Tunnel della Pierina

Consolidation and reshaping of the Pierina Gallery near Lake Santa…

Impressa Silvio Pierobon | Galleria Della Pierina

Catajo Gallery

Consolidation of the pier and hydraulic works of the Catajo…

Municipio Vechio a Cortina d'Ampezzo

Cortina d’Ampezzo Old Town Hall

Refurbishment and consolidation of the roof and basement of the…

Sottopasso Bordighera

Urban Bordighera underpass

Trench excavation and urban underpass construction in Bordighera – Imperia.